Wednesday 10 September 2014

Conservatory roof arrives!

On Wednesday 10th September, the steel supports for the conservatory roof arrived at Scampston.

Each piece of steelwork was lifted high above the site and carefully lowered into place on the Conservatory roof.


More images of the work: 

The steelwork is loaded carefully onto the crane

Lifted high over the site

The first piece is lowered towards the conservatory

Guiding it down gently...

...and it slots into place.

High above the Walled Garden.

Returning for more...

Reaching far across the site.

Further pieces are lifted...

...lowered

guided...

...and made ready to be added to the Conservatory roof.

The restoration work is being led by Caroe Architects, with project management from Buro Four, and building contractors William Birch & Sons LtdThe superstructure of the conservatory has been minutely researched and removed to a warehouse for restoration. This will be returned to site in autumn 2014