Each piece of steelwork was lifted high above the site and carefully lowered into place on the Conservatory roof.
More images of the work:
The steelwork is loaded carefully onto the crane |
Lifted high over the site |
The first piece is lowered towards the conservatory |
Guiding it down gently... |
...and it slots into place. |
High above the Walled Garden. |
Returning for more... |
Reaching far across the site. |
Further pieces are lifted... |
...lowered |
guided... |
...and made ready to be added to the Conservatory roof. |
The restoration work is being led by Caroe Architects, with project management from Buro Four, and building contractors William Birch & Sons Ltd. The superstructure of the conservatory has been minutely researched and removed to a warehouse for restoration. This will be returned to site in autumn 2014